Ping your blog, website, or RSS feed for Free
Latest Post
Showing posts with label Kerala Government. Show all posts
Showing posts with label Kerala Government. Show all posts

Factory Available for Dismantling, India

-->


Factory for Dismantling at Kottayam, Kerala


Inspection available to Authentic Buyers.

(Was a carbide manufacturing unit, established by British Gov)
Factory cutting Scrap


Factory for dismantling and breaking


Factory Scrap

Factory Available for Dismantling

Factory available for scraping



Factory on Government Land about 11 ½ Acres Land leased from the earlier Travancore Government.

Reason for Closure: High electric charges
Period of Closure: more than 10 Years

Claims and Litigation
1.   Labor Claims:  All settled, few labors are still occupying the quarters in the premises. The confirmation from Labor Commissioner available
2.   Electricity : The KSEB liability one time settled liability of Rs.4.5 Cr is standing which will be cleared once buyer makes the deposit

Kerala Government has offered the support to clear the land. The Government wants to develop the 11 ½ acres land into IT Park. All necessary assistance will be provided from Government to clear the land.


Plant Details:
1.   The plant is adjoining to main Raod (MC road)
2.   The plant is fully constructed on structural beams
3.   Includes Electric furnace, electric installations and other machineries
4.   All structural beams are founded with steel foundations
5.   No side masonry walls for the main plant building

Vehicles (12 Nos)
1.   Eicher Trucks
2.   One Ceilo Car

Scrap Details
1.   M.S. Scrap : 55000 MT
2.   Gear Boxes : 150 MT
3.   Machineries : 800 MT
4.   Cranes : 5 Nos
5.   Electric Control Panels : 30 Nos
6.   Cables of Various Sizes : 5000 M
7.   Copper : 1200 MT
8.   Aluminum : 800 MT
9.   Brass : 40 MT
10.    Welding Set : 5 Nos
11.    Weigh Bridge : 2 Nos
12.    Nitrogen Plant : 1 Nos
13.    Rails : 15 MT
14.    Bucket Conveyor : 70 M
15.    Conveyor : 200 M
16.    Vehicles : 12 Nos
17.    Asbestos Sheets : 50  Loads

Estimated Quantity at the time of Closure: 70,000 MT and above

Besides above there are 2 stores with various imported and indigenous spares and other part, stocked before closure of the factory.

EXPECTED COST OF FACTORY: Plz Contact

Payment Terms
1.   First Step Advance at the time of signing the contract: Rs. 30 Cr.
2.   Balance payment in 2 steps with 45 days of dismantling



CUTTING AND DISMANTLING
1.   Daily dismantling minimum 200MT
2.   Workers required 30 Nos
3.   Total period of Dismantling 300 days approx
4.   JCB in 2 Nos and Winches in 2 Nos required
5.   Gas Cutter and other cutting equipments required

Approx cost of cutting and removing: Rs. 8 per Kg
Loading Charges to be paid to Local Union


Kottayam factory sold for demolition, dismantling, scrap factory


-->
Related articles

About Author

My Photo
Raghu R Naik
Hello, Am Mr.Naik, based at Navi Mumbai, India and operating business in Shipping, Ship Repair & Maintenance, Ship Spares and Mining Equipmet. facebook twitter instagram youtube linkedin external-link external-link external-link
View my complete profile
 
Support : Sitemap | Raw Mine | Ship Spares | Shopping
Copyright © 2011. IRON METAL SCRAP AND TRADING - All Rights Reserved
Supported by Surface logisitic Published by Engine Spares
Proudly powered by Blogger